Tuesday 20 September 2011

Rest of footings poured




On Tuesday we got the rest of the footings in. It was pretty hectic- pumped through some big tubes....

Phil leveled out the concrete with his "vibrating plunger" (!!!)

It was a rainy, muddy day- the site really looked like a muddy building site for the first time. But the concrete crept along, filling up the bottom of the trench and within an hour we had the stepped footings in place. Despite the rain we could walk on them the following day.